We do not subcontract the ground. Every one of these is run by Stanmoor supervisors with Stanmoor gangs, which is why the programme holds when the weather does not.

  • SVC 01

    Earthworks and bulk excavation

    Site clearance, cut and fill, muck away and remediation, from enabling works onward.

    Typical package: 5,000 m³ to 120,000 m³
  • SVC 02

    Drainage and utilities

    Foul and surface water, attenuation, ducting and service trenches, adoptable and private.

    Typical package: 400 m to 9,000 m of run
  • SVC 03

    Reinforced concrete and foundations

    Pile caps, ground beams, rafts, slabs, retaining walls and pits, self-delivered.

    Typical package: 200 m³ to 6,000 m³
  • SVC 04

    External works and surfacing

    Roads, car parks, kerbing, paving, fencing and soft landscaping to completion.

    Typical package: 1,000 m² to 40,000 m²

How we price

Measured, not guessed

We take off from the drawings and the site investigation, and we tell you which quantities we are confident in and which depend on what is actually in the ground.

Discovery risk in the open

Made ground, obstructions and water are priced as provisional quantities with a rate, not buried in the preliminaries. If we do not hit them, you do not pay for them.

One programme

Because all four packages are ours, the sequencing between them is our problem rather than a series of interface claims between subcontractors.

Ten working days for a full tender