Earthworks and bulk excavation
We are usually the first contractor on site and the one whose programme everyone else inherits. Getting the levels and the drainage falls right in week one is what stops the frame contractor losing a fortnight in month three.
Levels you can build on
Every machine on our earthworks fleet runs GPS control off the engineer’s model, so formation is cut to tolerance the first time rather than chased with a dumpy level afterwards. We issue as-dug survey data weekly, which means the structural engineer signs off formation without a site visit.
Where the ground turns out worse than the site investigation suggested, you get a call the same morning with the options and what each costs, not a variation three weeks later.
Muck away that stands up to an audit
Every load off site travels under a waste transfer note with the correct EWC code, to a permitted facility, on a registered carrier. Weighbridge tickets are reconciled against our own count and issued with the monthly application.
On remediation sites we work to the validation plan and hand over a pack the local authority will accept, rather than leaving you to assemble it at the end.
Scope
What is included
- Site clearance, demolition arisings and grubbing up
- Bulk excavation, cut and fill, and level reduction
- Muck away under a duty of care chain, with weighbridge tickets
- Imported fill, capping layers and sub-formation
- Remediation of made ground under a validation plan
- Attenuation basins, ponds and swales
Also ours
- SVC 02
Drainage and utilities
Foul and surface water, attenuation, ducting and service trenches, adoptable and private.
- SVC 03
Reinforced concrete and foundations
Pile caps, ground beams, rafts, slabs, retaining walls and pits, self-delivered.
- SVC 04
External works and surfacing
Roads, car parks, kerbing, paving, fencing and soft landscaping to completion.