News
Things worth writing down
Not a blog. Occasional notes on how we work, published when there is something a client or a site manager would actually use.
GPS machine control now runs across the whole earthworks fleet
The last four excavators were fitted in July, which means every machine on an earthworks package now cuts to the engineer’s model rather than to pegs.
Read itSection 104 drainage: what actually slows an adoption down
Four things hold up an adoption agreement, and three of them are decided before anyone breaks ground. Worth knowing if you are programming a residential site.
Read itOur three-year accident frequency rate, and how we count it
We publish the figure and the method, because an AFR quoted without a method is not a number, it is a claim.
Read it
Want these by email?
We send them roughly every other month, to about four hundred people, and never more often than that.